I was able get the frame and transmission plate built during the last 2 evenings. No had one assembly problem though with the upgraded landing skids. The mounting holes in the carbon didn't line up with the mountain holes in the frame!
I ended up increasing all of the mounting holes diameters until they were big enough to compensate for the misalignment. Lame.
The assembly of the transmission plate went smoothly though, so I'm happy again :). Next up is assembly of the head block and swash plate. Just so I can mount the blades and see how big this sucker is!
No comments:
Post a Comment